Equipment Qualification

Equipment Qualification

Our certified Field Service Engineers conduct a complete analysis of the effectiveness of filling and packaging lines through standardised performance indicators to guarantee the best possible operational efficiency and equipment reliability

Pre Installation

1. System Design Review (user requirements specification & Design qualification)

2. Aseptic Technology Introduction

3. Plant line pre-inspection

4. Factory Acceptance Test (FAT)

ipi brick

Post Installation

5. Site and Performance Acceptance Test (SAT, PAT)

Crucial for your overall validation program, whether your equipment is new or relocated.

  • IQ (Installation Qualification, e.g. positioning)
  • OQ (Operational Qualification, e.g. utility connections, system is operating as designed)
  • AQ and PQ (Quality and Performance Qualification, e.g. dry or product run)

6. Site Manager and Production Supervision

Post Installation